cinema installtion

Sep 03, 2018

The life cycle  of a new theater should generally start from the planning and  construction of the building where the theater is located. Whether it is  in a comprehensive commercial center or a single-family building, how  is the theater structure reserved? Need a few cinemas? It  is crucial to determine the size of the movie theater in order to meet  the equipment and equipment. These problems require the positioning of  the theater and the layout and equipment of the surrounding competitors  to make reasonable technical solutions, so that the theater can be  built. The capital investment is reasonable and capable of operating efficiently and attracting customers in the future operations.

Cinema splitter.jpg

The  design department of the theater building often needs the developer to  provide information such as the functional requirements of the entire  building, so that the structural design can meet the functional  requirements and meet the requirements of fire protection. However,  as a developer, it is often impossible to determine all the partners of  the theater before the building is completed. Even if communication is  already being carried out, it is often impossible to obtain a definitive  and detailed construction requirement, and each theater investment  company often has the same project for building the same project. Your own unique program.

cinema design.jpg

According to the  characteristics and positioning of the project, the cinema investor  should request the technical personnel to give the technical conditions  required by the project as soon as possible. For example, it is not  necessary to reserve the giant curtain hall, and how much height should  be left to meet the future screening requirements. In  this way, we can take an active advantage in the competition of the  cinema project. At the same time, once we win the project, we will avoid  many unresolved issues such as inappropriate site conditions in the  future construction.


After the contract of the  cinema project is signed, the project will enter the design cycle  according to the normal steps. In the process, the theater needs to  propose the corresponding design requirements according to the project  site conditions, so that the designer can conveniently organize the  design unit to the theater. The decoration and other content are deepened. At  this time, the equipment technical solution for the theater also needs  the theater technicians to prepare and compare the plans in advance, so  that the technical decision-making layer of the company selects which  technical equipment plan, such as whether the giant curtain hall adopts  IMAX or the Chinese giant screen or the ordinary double-machine giant. Curtain  and other systems, projectors use ordinary light source or laser light  source, the sound-reducing equipment is made of domestic or imported, is  the use of 5.1 or panoramic sound, the screen uses the ordinary screen  or the metal screen, do not do 4D cinema and so on. The  proposal proposed by the technicians in this process is an important  basis for the investment company to finalize the project investment  scale and theater level, and also determines the success or failure of  the later operation.

digital cinema.jpg

After the  project starts construction, it is necessary to continuously verify the  construction conditions and equipment installation conditions.  Otherwise, it will easily cause installation and use problems after the  equipment enters the market. At the same time,  according to the progress of the project, the time nodes of various  technical solutions and equipment reservation conditions should be  arranged reasonably. For example, at what time point, what kind of line  reservation is required, so as not to enter the field too early or  affect the next process and time equipment When is  the time to go out of the box to install and debug, the conditions are  not enough to cause the equipment to accumulate too much dust to affect  the subsequent use, but also need to pay attention to whether the  equipment installation location is reasonable, whether the equipment  access channel meets the requirements, whether the equipment debugging  power is up to standard, etc.


Before the final  installation and commissioning of all cinema equipment is completed,  the cinema technology needs to be highly cautious and not let go of any  subtle loopholes in order to finally enable the theater to successfully  reach the screening conditions.